Pump Station Shoaiba Jeddah – Saudi Arabia

Pump Station Shoaiba

Jeddah – Saudi Arabia

Order Description:
Commissioning of Electrical System

Client:
ABB AG

Volume:

580,000 EUR

Period:
2008 - 2010

Scope of Work:

Autonomous and independent supervision incl. protocols of the following components:

Main pump station Shoiba:
›  28 pcs. LV-switchgears 13.8 KV
›  3 pcs. HV-transformers 63 MVA 380/13.8 KV
›  3 pcs. LV-transformers 1000 KVA
›  3 pcs. transformer protection systems
8 pcs. HV-motors
3 pcs. Motor Starters
5 pcs. LV-switchgears 0.4 KV
11 pcs. LV-sub distributions
1 pcs. UPS-system
1 pcs. Batteries


Booster pump station:
›  20 pcs. MV-switchgears 13.8 KV
›  32 pcs. LV-transformers 630 KVA
›  8 pcs. HV-motors
›  3 pcs. LV-switchgears 0.4 KV
7 pcs. LV-sub distributions
1 pcs. UPS-system
1 pcs. Batteries