Order Description:
Supervision Signalling and Telecommunication System

Client:
Obermeyer Beraten + Planen GmbH

Volume:
150,000 EUR

Period:
2008 - 2009

Scope of Work:
›  Verification of the signalling system with regard to the operation requirements for a maximum speed of 250 km/h
›  Verification of the telecommunication system with regard to the interfaces with the power supply and signalling system
›  Supervision of signalling system implementation
›  Supervision of GSM- und telecommunication system implementation
›  Supervision of cable system implementation
›  Calculation of short circuit current for the 2 x 25 kV network
›  Earthing concept
Special earthing concept for bridges
Requirements specification for autotransformers and substations